One direction.Zerocompromise.

Our plant in Derabassi is built around a single idea: material and people move one way only, from washing to packing, so nothing that leaves the sterile zone ever comes back into it.

Class 100 LAF at fillingHEPA terminal filters
(01) — The process

Seven steps. One direction.

01

Automatic vial washing

Every vial is washed on an automatic GMP-compliant machine before it enters the sterile zone. Material and people move in one direction only.

Uni-directional flowSeparate rooms
02

Sterilising tunnel

Washed vials pass through a sterilising tunnel straight into the aseptic area, with door interlocks at every critical point.

Door interlocksSeparate change rooms
03

Filling & stoppering

Automatic powder filling and bunging under laminar airflow, in a Class 100 environment. Utilities are serviced from a separate floor above.

Class 100 LAFHEPA terminal filters
04

Sealing

Filled and stoppered vials are sealed automatically with aluminium flip-off caps, keeping each vial airtight and tamper-evident.

Automatic sealingFlip-off caps
05

Inspection

Every sealed vial is inspected against a lit background for particles, cracks, fill level and seal defects. Rejects are removed before the vial moves on.

100% inspectionParticle & seal check
06

External vial washing

Inspected vials are washed on the outside to remove any powder traces from the surface, so labels sit clean and the finished vial is spotless.

External washClean label surface
07

Labelling & packing

Automatic labelling with batch, manufacturing and expiry details, then packing in an area fully segregated from material and people movement. Epoxy floors and impervious walls throughout.

Segregated packingBatch-coded labels
(02) — Plant design

Built forsterility.

Every design choice in the plant is there to keep the aseptic area clean and the product protected.

Flow

Uni-directional movement

Materials and people move in one direction only, through separate rooms for each stage.

Access

Separate change rooms

Graded change rooms and door interlocks at every critical entry to the aseptic area.

Air

Class 100 at the point of fill

Powder filling, stoppering and sealing take place under laminar airflow in a Class 100 environment.

HVAC

Clean, controlled air

About 90% air recirculation, terminally placed HEPA filters and Bry-Air dehumidification.

Utilities

Serviced from above

Utilities run on a separate floor above the sterile area, so maintenance never enters the clean zone.

Finishes

Epoxy floors, impervious walls

Easy-to-clean surfaces throughout, and a packing area fully segregated from material and people movement.

(03) — Support areas

Around thesterile core.

Warehouse

Quarantine first

Raw materials are quarantined on arrival and released only after QA approval. Rejected material is locked away separately.

Laboratories

QC & microbiology

Separate chemical and microbiology laboratories on site. See Quality.

See itfor yourself.

Buyers, partners and auditors are welcome to visit the plant. Ask us to arrange a visit or a video walkthrough.

WhatsApp